You don't have javascript enabled. Good luck with that.
Pencarian
Ribuan PJLP dan Ratusan Armada UPK Badan Air Siap Tangani Sampah Saat Hujan Deras
.
photo Mochamad Tresna Suheryanto - Beritajakarta.id

Water Body UPK States Its Readiness to Face Rainy Season

Jakarta Environment Agency's Water Body UPK deployed 4,000 personnel to clean up rivers and reservoirs from garbage.

In this rainy season, we have prepared 4,000 personnel to handle garbage in water channels

Jakarta Environment Agency's Water Body UPK Head, Yayat Supriyatna explained, his side deployed 99 trucks, 92 pick-up cars, and 134 heavy equipment units.

"In this rainy season, we have prepared 4,000 personnel to handle garbage in water channels. Our preparation in this rainy season is quite extra. We have SOPs based on Alert 1, 2, 3 status, start from human resources, heavy equipment, and fleets to transport waste which needed on standby," he informed, Tuesday (9/29).

750 Sacks of Mud and Garbage Collected from Phb Channel on Jl. Basmol

If Katulampa Reservoir is on Alert 1 status, he continued, his personnel and heavy equipment must be ready to handle garbage in Ciliwung River and West Flood Canal.

There are four locations where personnel deployed to clean up garbage; Kampung Melayu, Manggarai Sluice Gate, Karet Sluice Gate, and Season City Sluice Gate. At each location, his side could operate three heavy equipment.

"Our priority is to ensure water level is not too high, thus garbage can be handled immediately and water can flow optimally," he mentioned.

His side is optimistic to be able in handling waste in water channels when heavy rain falls within one or two days.

"The emplacement capacity is still adequate on Perintis Kemerdekaan. When it is overloaded, we will shift it to Plumpang," he closed.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1065 personAldi Geri Lumban Tobing
  2. Parekraf Agency Introduces Jakarta as a Global City at IBTM World 2024

    access_time23-11-2024 remove_red_eye931 personAldi Geri Lumban Tobing
  3. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye926 personFolmer
  4. Jakarta Baznas Bazis Ready to Support Disaster Preparedness

    access_time25-11-2024 remove_red_eye760 personAldi Geri Lumban Tobing
  5. Gubernatorial Election Logistics in Seribu Island Distributed

    access_time26-11-2024 remove_red_eye579 personBudhi Firmansyah Surapati